Subdivided flats in Yuen Long: separate electricity meters, extra sockets and fire safety

 | Repair guides Sze Kit Electrical and Plumbing House Maintenance

Yuen Long Unit Hydroelectric Project: Independent meter, distribution plate and installation plugin

Focus Preview

  • The simple House Ordinance (Chapter 658) is now in force. 1 March 2026 Entry into force.
  • Registration period for current part units to 28 February 2027 Stop, registration is free of charge; Successful registration can be granted to 28 February 2030 the grace period.
  • The crime clause for the illegal rental branch unit is: 1 March 2027 Entry into force.
  • The unit must meet the minimum standard of living in eight different areas, including:Independent Water Watch and Fire safety。
  • Electrical work must be carried out by a certified electric contractor and upon completion a certificate of completion (form WR1).

Yuen Long has many subdivided units. With the Basic Housing Units Ordinance in effect, owners and operators face work beyond routine repairs, including installing individual electricity and water meters and upgrading electrical installations and fire safety provisions.

This guide from Sze Kit Electrical and Plumbing Services, a registered electrical contractor in Yuen Long, explains the timetable and minimum standards, with a focus on electrical and plumbing work. For the full requirements and current arrangements, consult the Housing Bureau's Basic Housing Units website and the relevant codes of practice. For our services, see Our services The use of the Internet; Query and offer are available.Contact us。

I. Timetable for "Simplified House Regulations"

The Basic Housing Units regulatory regime provides a total transition period of 48 months for owners and operators of existing subdivided units to meet the requirements.

DateArrangements
1 March 2026Entry into force of the Regulation (except for the offence of unlawful leasing); Starting to accept registration applications for existing units and a simple room accreditation application.
1 March 2026 to 28 February 2027It is a 12-month registration period. Existing branch units can register free of charge to obtain a grace period
1 March 2027The terms of the illegal rental branch crime are in force. It's illegal to rent a branch without a valid grace period and without a valid permit for a simple room, and criminal liability.
1 March 2027 to 28 February 2030A 36-month grace period; Registered units can carry out remodelling and apply for accreditation
  • Who can register:The current branch is owned by a person or who has written consent from the owner.
  • Validity period:A simple room authentication is valid for 5 years.
  • Authentication fee:The government has indicated that it will provide a "early bird" reduction for the certification fee, encouraging owners and operators to register and apply as early as possible. The details and conditions are subject to publication by the Housing Authority.

II. Eight Minimum Standards for Living Environments

The unit must meet the minimum standards for eight of the following, and obtain a simple room certification before it can be legally rented for residential purposes.

TemplatesMain requirementsHydroelectric engineering involved
Lowest AreaEach branch must have at least 8 square meters of inside floor space.—
Minimum heightThe floor to the roof of the room shall be at least 2.3 metres; The floor to the bottom of the beam is at least 2 meters.Lines and pipes inside the ceiling must remain high.
Fire safetyThe common parts of each branch unit and the main building should be separated by at least one stand-alone fire detector; The common corridor must be wide enough.Power device security, seating position of the watch and distribution plate
Structure secure.We have to meet the loading requirements.—
Independent toilet.Each unit must have at least one enclosed and waterproof toilet with a toilet, a wash basin and a tub or shower nozzle.Water supply, drainage, waterproofing, hot-water stoves and gas fans
Water supply requirementsIt's a proper water supply arrangement.Drainage and drainage works
Light ventilationYou have to meet the lighting and ventilation requirements.Lamp slots, air fans and their power sources
Independent Water WatchEach branch must have an independent water watch provided by the Water Department and a stand-alone meter provided by the electric company.Power, power, water, water.

Of the eight models, the most relevant to the water and electricity project are stand-alone water watch, fire safety, stand-alone toilet and lighting ventilation. The following sections illustrate each of them.

III. INDEPENDENT COWS

According to the minimum standard, each branch must have a stand-alone meter provided by an electric power company (China Power or Hong Kong Light) for that branch. Yuen Long is the electricity supply range of China.

The good thing about installing a stand-alone watch.

  • Conformity:The independence watch is one of the lowest standards.
  • Clear charge:The renters pay for electricity on a real basis and reduce the price of the share.
  • Increased security:The installed electrical equipment must be checked and tested to ensure that it is in compliance with the legal security requirements.

What to notice before installation

  • The power plant that is changing the unit must be approved by the owner.
  • The power supply capacity of the original unit may not be sufficient to cover the total load after the break, and requests for additional power supply from electric companies should be required.
  • If a watch or line is to be installed in a common part of the building, or if it is required to connect to a public main line of the building, agreement may have to be obtained on the building management contract and an early inquiry should be made with the administration or the board of directors.
  • The location of the watch and distribution plates must be in line with the fire safety requirements of the shared corridor.

General application and construction process

  1. A licensed power contractor was hired to assess the current electrical power and load.
  2. The plan is to map the distribution panels, circuits and watch locations of the subunits.
  3. A petition for a stand-alone watch was submitted to the electric company.
  4. To carry out the required electrical retrofitting.
  5. A certified electric contractor inspects and testes a fixed electrical device and signs a certificate of completion (form WR1).
  6. The electricity company rejected the power supply and installed a stand-alone meter.

The application for a stand-alone watch involves the approval and installation of an electric company, which takes longer to prepare, and suggests that the owner should start preparing as early as possible. The actual application and the required documentation are based on the latest requirements of the electric company.

Legal requirements for electrical engineering (data source: Electric and Mechanical Services Department)
  • Any power work, including the installation, re-engineering, inspection, testing and maintenance of electrical devices, must be carried out by a certified electric contractor.
  • Upon completion of the inspection and test, the certified electrician contractor and the certified electrician must sign a certificate of completion (Form WR1).
  • The owner should engage a certified power contractor to carry out a feasibility study, taking into account the amount of electricity needed after the day, to determine whether an additional power supply is required from the electric company.

IV. PACKING AND RETURN PLANS

Although the unit size is small, each has a stand-alone lighting, cooling, hot water stoves and boilers, which are more electric than normal dwellings. When a unit is multi-channeled, the total amount of electricity used is often much higher than originally designed and is a common reason to overload the breaker jump (also written as "the breaker jumper").

Load assessment

  • The power supply for each branch unit, including air conditioners, hot water stoves and boilers, is estimated.
  • The government has been able to evaluate whether the total power supply capacity of the original unit is sufficient to cover the total load after the partition.
  • If there is a shortfall, an additional power supply must be requested from the electric company.

The rules of the road trip.

  • Each branch has a stand-alone distribution panel and leaking circuit breaker.
  • Lighting, plugs, cooling and waterhead separate circuits.
  • There is a stand-alone circuit for large power generators such as air conditioners, i.e. heat furnaces.
  • Sockets in wet areas near toilets and cooking facilities require residual current protection.
  • The rules of the wires must match the load on the circuit.

I'm thinking about putting in a plug.

Too few sockets encourage prolonged use of power strips and increase overload risk. Plan new sockets around furniture and appliances and check circuit capacity. Do not run unauthorised wiring or share circuits to save money.

Further reading:Why breakers trip、Planning plumbing and wiring for a renovation

V. Fire safety and power

After a small unit has been formed, the corridors, access points and escape routes are affected, as well as electrical power-intensive conditions that put fire at higher risk than normal homes. In accordance with the Standard Minimum Operating Standards for Living in a Simple House, fire safety requirements include:

  • Fire detector:The common portion of each branch unit and its main building must be separated by at least one stand-alone fire detector, the best place to be installed is the roof of the room.
  • Common corridors:The common corridor to the branch must meet the minimum level of clarity, depending on the unit's fire gate.
  • Fire extinguisher:The common portion must be equipped with fire extinguishers.

Overloads, short circuits, aging power lines and self-strangling are common causes of electric fire alarms. The installation of electrical devices, i.e. stand-alone distribution panels, leaking circuits and adequate circuits, is in itself an important fire protection measure.

Fire safety involves a number of specialized disciplines, such as fire doors, barriers and escape routes, which must be handled and certified by relevant qualified professionals; The power component has to be left to a certified electric contractor. The details of each request are available in the code of practice.

VI. INDEPENDENT WATCH AND WATER

According to the minimum standard, each branch must have a stand-alone water watch provided for it by the Water Department. In addition, each sub-unit must have an independent toilet enclosed and waterproof, with a toilet, a wash basin and a tub or shower nozzle; There is also a need to have water points and wash basins outside the toilet.

Water supply and drainage problems that are common in the branch offices.

  • Weak water pressure:Water pressure drops when many households use water at the same time.
  • Water pipes ageing:The old building's old pipes may have aged.
  • Increased drainage load:Many units share the drainage system, which is easier to block.
  • Waterproof:The new toilets and the location of the washes are not enough to make it easier for the downstairs household units to water.
The application for water supply and plumbing must be made in accordance with the regulations of the Water Authority, and the application form (WWO 46) must be filled out by a licensed plumber. When installing or refitting electric water heaters, the Electrical and Electric Engineering Agency requested the employment of licensed electric contractors and licensed plumbers.

Further reading:What to do about a leaking pipe、Drain clearance guide、Water heater repair or replacement

VII. CORRECTIONS AND EXCHANGE

Light ventilation is one of the eight models. In addition to being comfortable, it is important that the air and ventilation facilities are not only comfortable, but also in terms of cynicism and laxity.

  • Power:Each unit's air conditioners should have a stand-alone circuit and be denied the distribution to that unit.
  • Drainage:The condensed water must be properly drawn away. It would be illegal to let the air conditioners drop water and not comply with the Food Environment Agency ' s notice of an incident, which is punishable by up to $25,000 and a daily fine of $450.
  • Outdoor location:It is important to keep an eye on the limits of the building's management contract and the outer wall.
  • Mechanical ventilation:There is no toilet or room suitable for the windows, and there may be a need to install mechanical ventilation equipment such as air-jet fans, with a plan on power supply.

Further reading:10 major reasons why the air conditioners is not cold enough.、Cleanup of air conditioners Period、Bathroom heaters and extractor fans: repair or replacement

VIII. COMPLETE ELECTRONIC PLANS

Inter-unit modifications involved power, water supply, fire and ventilation, and were easily duplicated by piecemeal disposal. It is suggested that the following steps should be taken:

  1. Registration:The current unit should be registered during the registration period to obtain a grace period.
  2. The current situation is assessed:This is the first time that we have been able to find out about the power supply, pipes, drainage and fire-fighting conditions of our original units.
  3. Planment:The number of units and their layout are determined by the lowest size and height criteria.
  4. Electricity plan:The project is based on a total load, and plans for the establishment of stand-alone monitors, distribution panels and circuits.
  5. Water supply scheme:The project is designed to provide a stand-alone watch, water supply, drainage and waterproofness.
  6. Fire and ventilation:To ensure that fire detectors, corridors and ventilation meet the requirements.
  7. Construction and Inspection:Upon completion of the work, the required supporting documentation was obtained.
  8. Could not close temporary folder: %s I'm not going to ask for a room permit within the grace period.

IX. Fees for the reference to the branch water and electricity works

The following is a reference range, and the actual fees are determined by the number of units, scope of work and materials, and the price will be the same after the above assessment.

ItemReference fee
Independent watch requests for assistance and electrical equipment testing.Depending on the number of units and the condition of the device.
Proof of electron test.About $1,000 – $2500/
Add a stand-alone distribution panelAbout $1,500 – $5,000 per person
Adding a socketAbout $150 – $400/
Add residual current dataAbout $500 – $1,200
Add pipes, drains.It's a price-for-all.
Toilet, wash-basket installation.It depends on the price of the broom.
Water leak maintenance.About $400 – $1,200
Purge Air ModerationAbout $300 – $500/part
Installation or maintenanceAbout $400.

The fees for other projects are available.Yuen Long repair prices for 2026。

X. Common error zones

Mistake One: No problem with registration.

Registration period until 28 February 2027. As of March 1, 2027, a branch unit that does not have a valid grace period to register and has no valid simple room certification is illegal and may involve criminal liability. The current storage unit may be registered free of charge to obtain a grace period, even if it does not meet the minimum standard.

Mistake 2: Registration equals the rule.

Registration is a grace period and does not amount to authentication. The unit must still complete the required renovations within the grace period and obtain a simple room certification.

Error 3: Power works can find any maintenance technician.

Work on the fixed power plant must be done by a certified electric contractor and upon completion a certificate of completion (Form WR1). How to verify eligibility, see How to select a registered electrical contractor。

11-Step unit emergency electrical response

  • A separate unit breaker jumps:Check the unit’s distribution board, then switch off and unplug the appliances in use before the trip if safe. If the breaker trips repeatedly or there is a burning smell, isolate the main supply if safe and call an electrician. Do not keep forcing the breaker on.
  • Leakage or pipe bursting:This post is part of our special coverage Syria Protests 2011. There is a high number of units, and leaks can easily reach each other's neighbors and the households downstairs, which need to be handled as quickly as possible.
  • The electrics are smoked or smelled:Switch off the main supply if safe. Never throw water on electrical equipment. If a fire has started, leave immediately and call 999.

Sze Kit Electrical and Plumbing provides 24 hours of emergency power maintenance in the new zone. Emergency response options available.Overnight emergency repairs in Yuen Long。

XII. Daily maintenance

  • Electricity:Periodically press the test button for each unit breaker; Watch if the plugs and power switches are heated, colored or loose. In the case of frequent breakers, the cause should be identified at an early stage.
  • Water supply and drainage:Inspect taps and connections periodically for leaks. Remind tenants to keep debris out of drains.
  • Water heater:Regular cleaning of air conditioners and inspection of the operation of hot water furnaces.
  • Fire-fighting equipment:As required by the Code of Practice, fire detectors and fire extinguishers are regularly inspected.
  • When the tenant changes:Check the water and electricity situation of the units. The rental unit's maintenance duty, available.Who pays for repairs in a rented home?。

13: The selection of a sub-unit for water and electricity.

  1. _Other Organiser Electrical works must be carried out by a certified electric contractor, which can be checked in the register of the Agency ' s website.
  2. The following are required by the rules:The contractor should be aware of the requirements for stand-alone watch, circuit planning and supporting documentation.
  3. Coordination of the entire job:It will be detected by the power plant and re-installed to sign a certificate, followed by the same contractor, which will reduce the amount of time spent on coordination.
  4. The fee is transparent:For work involving multiple units, a full price is to be obtained for the individual fees.
  5. Getting familiar with the region:After the day of convenience, maintenance and emergency support.

What you should be looking at when asking for a price is available.Repair quotation pitfalls。

XIV. Common problems

When did the House of the Plains Regulations come into effect?

The Simple House Ordinance (Chapter 658) entered into force on 1 March 2026. The registration period for the current branch units is from 1 March 2026 to 28 February 2027, and successful entries are eligible for a 36-month grace period from 1 March 2027 to 28 February 2030. On March 1, 2027, the article on illegal rental branch units entered into force.

What are the minimum standards for the eight living conditions in a simple room?

The eight categories are minimum area, lowest altitude, fire safety, structure security, stand-alone toilet, water supply requirements, lighting ventilation, and stand-alone water and electricity watch. The unit must meet these criteria and obtain a simple room certification before it can be legally rented for residential use.

Do you need to install independent electric and water watch?

Yes. According to the minimum standard for living in a simple house, each branch must have an independent meter provided by the electric company for the unit and by the Water Department for the unit.

Do you need a fee for the registration of existing branch units?

The current number of branch units is free of charge. If the unit meets minimum standards for living conditions, it can register first to obtain a grace period.

How long does a simple room pass last?

The permit is valid for 5 years.

What proof do you need for the power work in the branch?

According to the Department of Electrical and Electrical Engineering, any electrical work must be carried out by a certified electric contractor; Upon completion of the inspection and testing, the certified electrician contractor and the certified electrician must issue a certificate of completion (form WR1) to confirm that the electrical device was in compliance with the statutory security requirements.

Do the units need to install a fire detector?

Yes. According to the Standard Minimum Operating Standards for Living in a Simple House, the share of each branch unit and its main building must be divided by not less than one stand-alone fire detector.

Summary

Following the entry into force of the Simple House Regulation, the owners and operators of the branch offices are required to register during the registration period and to complete their renovations and obtain certification within the grace period. Among the minimum standards for eight of these, stand-alone water watches, fire safety, stand-alone toilets and lighting ventilation are directly related to water and electricity works, with early consolidation planning that avoids duplication and delays.

Sze Kit Electrical and Plumbing House Maintenance Company is a certified contractor for electrical engineering, which can perform electrical equipment survey, distribution and rerouting for units in Yuen Long, Tin Shu Wai, Tuen Mun and the New Zone, add plugs, and daily water and air maintenance before all construction starts. Team background available.About us and Past projects。

This is not a legal opinion. The requirements and arrangements are based on the Housing Authority's simple house website, the Simple House Ordinance and the relevant rules of practice.