Ten wiring and plumbing decisions to make before planning a renovation
Key points
- The water and electricity cover project, which has to be finalized at the opening stage; The wall is sealed before it changes, and it has to be reopened.
- A list of the house's entire power supply and electricity use is provided, with a certified electric contractor assessing whether there are enough negatives.
- In the case of a large power plant, independent circuits should be set up. Plug-in circuits must be protected by residuual current device.
- Bathroom plugs must be 0.6 metres away from a tub or shower nozzle and protected by 30 mA leak breaker.
- The power work involved in the repair must be done by registered electrical contractor Carrying on, and obtaining WR1 certificates of completion.
- The new version of the Electricity (Line) Rules and Regulations is now due to expire on December 31, 2026.
Renovation plans often focus on style, materials and furniture while leaving the services layout as it was. Once wires and pipes are behind walls or under the floor, adding a socket or moving a drain requires opening the finishes. Planning these changes before drawing up the layout can save considerable expense.
Written by Sze Kit Electrical and Plumbing Services Collapse. The company holds the business qualifications of certified electric engineering contractors and small-scale engineering, which it accepts.Full house.and Local fit-out electrical and plumbing work. Drawing on the EMSD Code of Practice for the Electricity (Wiring) Regulations and its household electrical safety guidance, this guide sets out ten issues to consider before finalising a floor plan.
1 Evaluate power demand and supply loads first.
The Electrical and Mechanical Services Department advises residents to arrange a feasibility assessment by a registered electrical contractor before adding to or altering a domestic installation. The assessment should consider future demand and whether the electricity supplier needs to approve a higher load.
List of electrical devices to be prepared before the plan is drawn
| Category | It's a regular electrical thing. | Keep an eye on the plan. |
|---|---|---|
| Temperature | Window or branch machines in each room | Number, number of horses and location of installation |
| Hot water. | Water or heat | The heat is much higher than the water storage. |
| Cook. | Electromagnetic furnaces, electric pottery, electric furnaces, steam furnaces | Most of the embedding stoves need a special circuit. |
| Wash. | Laundry, dryer, dishwasher | We need electricity, water and drainage. |
| Kitchen small power. | Snowboxes, microwaves, rice cookers, electric hot pots. | It's a good opportunity to use it. |
| Other | Bathroom jewels, dehumidifiers, electric heater, electric vehicle charger. | Should it be added after the day? |
The list should include brand models or power levels, as well as electrical devices that are to be added after the day. The certified electrician union calculates the maximum electricity demand by this date.
When there's an underload.
If the calculator results exceed the unit’s allowable load, it is necessary to request a change of power charge from the electric company, which will be installed by a certified electric contractor and will submit a certificate of completion at the time of the electrical company’s inspection. In other cases, the consent of the owner of the building's uplifting bus is required. Rural housing and business applications Three-phase powered.The process, see.A guide to the country's residential three-phase electricity.and Electrical and plumbing work for shops and restaurants。
2 Legal requirements for electrical works
The Department of Electrical and Electrical Engineering has made it clear that the owner of the electrical device must arrange for any power work to be done by a certified electric contractor, including installation, refitting, inspection, testing and repair.And the power work involved in the renovation works is no exception.。
- Electricity work must be carried out by certified electricians and by the appropriate level of licensed electrician.
- The project must meet the technical and safety requirements of the Electricity (Line) Regulations.
- After completion and before the power is turned over, it must be checked and tested by a certified electrician.
- Certified electricians and engineers are required to sign a certificate of completion (Form WR1).
- The user is not required to hand over the certificate to Electric and Medical Services Department, but should keep it properly.
- It is illegal to employ a non-certified electric contractor for power work, with a maximum fine of HK$ 100,000 and imprisonment for six months.
The grace period for the new version of the working code
A new version of the Electricity (Line) Rules and Regulations was published on December 31, 2025 with a one-year extension. If the device is designed in accordance with the 2020 Code, it must be supplied and connected by 31 December 2026. The owner of the project, who plans to work after the end of the year, may wish to confirm with the contractor which version of the project is designed in accordance with the code.
When the fit company passed the verdict,
Many of the repair companies themselves were not licensed electric contractors, but rather divided between electrical works. Before signing the agreement, the owner should ask the host name and registration number of the power project and deliver WR1 after completion of the contract. See you at the check.Choosing a repair technician in Yuen Long and Choosing a registered electrical contractor。
3 Split and stand-alone circuits.
The whole house is not supplied by a single circuit, but by distribution plates divided into “final circuits”, each protected by a breaker. It's a well-designed division that doesn't run out of power in the event of a failure of another circuit.Breaker jumps.。
The basic principles of the rules of work.
- An amber's single-stage electric power, which is not more than 13, can be used to supply electricity in a circular or radio-final circuit of the Ampere Plug.
- Each 13 Ember Plugar circuit has a maximum floor size, with larger units divided into multiple circuits.
- Antpe’s domestic power system, which has an additional power flow of more than 13, should be permanently connected (i.e. not through plugs and plugs) to a stand-alone, radio-final circuit, controlled by a two-polar switch that is located in an accessible location near the electric power plant.
It's a common split.
| Circuit | General approach |
|---|---|
| Lighting | It's an independent circuit. Larger Time Segment |
| Dining room and bedroom booth. | Division of one or more circuits by area and amount of electricity used |
| Kitchen plug. | Set up a separate circuit and separate the other rooms. |
| air conditioners | Every single circuit. |
| Electricity | Independent circuits and two-polar switches. |
| The electromagnetic furnace. The electric furnace. | Special circuits to set currents. |
| Laundry, dryer. | Depending on power, it's appropriate to have a stand-alone booth. |
The above table is a common practice, and the actual design of each unit must be calculated by the certified electrician in accordance with the electrical code. The cause of the breaker jumps.Breaker trips and WR2 testing。
4 Location and Number of Plugins
According to the Department of Electrical and Electric Engineering, there should be sufficient for-purpose outlets in the room; The power should be supplied with a stand-alone plug-in. Each plugin should be plugged in only one canyon or one power plug-in to avoid overloading of the circuit.
Planning methodology
- First, the plaque is set and then the position of the plug will be fixed so that it is not covered by a closet or bed.
- A room-by-room list of fixed and portable electrical devices.
- This is the first time that a new power plant has been added to the system.
- Mark the location, height and use of each plugin on the plan.
Locations unsuitable for sockets
EMSD advises against installing sockets near taps, gas valves or cooking equipment. Additional clearance rules apply in bathrooms. See point six below.
Easily missed position.
- Enchantment: Talker, electronic door locks, shoe closet lighting
- Television walls: television, roof boxes, sound, routers
- Bedside and desk: charge and lamp
- In the kitchen: embedded electrics, oil smokers, water filters
- Bathroom mirrors and toilets: electric toothbrush, smart toilet board
- Window table or work platform: dehumidifier, air fresher
- Terraces or workspaces: washing machines, dryers
- Designed for inners: light belt transformers, electro-lifting devices
After you joined the club.Adding a socket Or go ahead.Moving a socket It is often necessary to re-open the walls and issue a separate certificate.
5 Power distribution and leak protection.
Electrical and Mechanical Services Department states that plug-in circuits must be protected by electric currents (commonly known as hydro). The working code specifies that the circuits for power outlets should have an additional amount of 30 millian residuary current power power.
The composition of the modern power distribution.
| Device | Role |
|---|---|
| Total Switches | Cut the power to the house. |
| Breaker (MCB) | All traffic and short-circuit protection. |
| Residual current data (RCD) | Detects leakage current and disconnects the supply to reduce the risk of electric shock. |
| Split Marks | Set out the range of every breaker. |
Consideration should be given to the conversion or upgrading of the power supply.
- Still using old fuses, no reductive current device
- There's not enough splits to allow for new circuits.
- With only one residual current device protecting the home, leakage anywhere can disconnect the whole supply.
- The power distribution is stunned or overshadowed by groceries.
Protection of circuit sections by different leaks and reduction of one leak that affects the entire house; This is a design option that can be discussed with the host. The distribution should be easily operational and not fit to be completely shut down by a made-up plaster.
6 Power requirements for bathrooms and kitchens.
Bathroom.
- Bathroom outlets must be installed at a distance of 0.6 metres from the tub or tub, with the remaining powering not exceeding 30 mA, or standard insulation transformer protection.
- Within the reach of a tub or shower nozzle user, fixed electrical devices may not be installed that can touch and heat elements thereof.
- An electric device or device may not be installed in a tub or shower-head pool.
- The metal parts of the bathroom must be subject to a code of conduct for the electrical position to be denied.
Planning Bathroom valet installed.and Pneumatic fan installation At that time, stand-alone power supply and switch positions should be reserved and the height of the ceiling and the direction of the vents should be confirmed.Repairing or replacing bathroom heaters and extractor fans。
Electricity
According to the Department of Electrical and Electric Engineering, when new water heaters are installed, fixed electrical devices and pipes must be installed by a certified electric contractor and a designated person requested by the Department.Gas water heater installation This post is part of our special coverage Global Voices 2011. Select and fail to judge.Five signs a water heater needs repair or replacement。
Kitchen.
- Electrical appliances in the kitchen, other than lighting, should be supplied by a separate circuit.
- This means that more than one stove and a total of over 15 Amber's cooking gear should be supplied by dedicated radio-final circuits.
- The plugin should avoid taps, boilers and gas switches in the kitchen.
- Keep sockets and connection points for built-in appliances accessible for servicing and safe isolation.
7 Temperature and drainage arrangements
- Electricity supply EMSD requires a registered electrical contractor to connect fixed-wired air conditioners. Do not connect another appliance to the same socket.
- Increment and Location: Determine whether to use the window or part machine, and the location of interior and outdoor machines before planning the plan.
- Bronze pipes.:Blank Air Conditionation Installing The copper pipes should be as short and less crooked as possible, with a hole in the wall.
- Drain.A cooling pipe must be slashed to the appropriate drainage level; Water should be tested in front of the seal when it is hidden on the ceiling or inside the wall.
- Arrays: Outdoor aircraft support may be small-scale work, but it must be done by a registered contractor.
- Maintaining Space: Insider perimeters and ceilings should be reserved for inspection, after convenience days Air Modem Cleaning。
Cold-air drains are not properly handled, and it's easy to show up later.Water leaking from an air conditioner See Ten reasons an air conditioner may not cool properly and How often should an air conditioner be cleaned?。
8 Water pipelines and drainage channels
Do you want to change the pipes while they're being repaired?
The walls and the floors have been opened, which is the best time to change old pipes. If there's a piping, water spill, water pressure is inadequate or leaks on several occasions, consideration should be given to Whole-home repiping。
Legal requirements for plumbing works
- The construction, installation, modification or dismantling of the internal water supply system require prior written permission from the Water Supervisor, usually on behalf of a licensed plumber.
- The work must be carried out by a designated person, including a licensed plumber, a registered plumber or someone who works under his direction and supervision.
Plan the plan.
| Item | What to notice. |
|---|---|
| The cold-hot water pipes are moving. | Shorter routes; Thermal piping increases the temperature; Stay away from the cold-hot pipes. |
| Secondary Switches | There's a stand-alone water supply in each area, so we don't have to shut down the whole house. |
| Angle button. | Individual angles for each detergent and water generator |
| Water power | Laundry machines, dishwashers, water filters, water intake and drainage levels for smart toilets |
| Drains. | I think it's time for me to have a little bit of an air. Avoid Too Diagonal |
| Move the place of the detergent | The further away, the more difficult it is to deal with, and may involve a public drainage pipe in a building. |
| Try pressure. | Before the wall is sealed, pressurize the new pipe and make sure it's not leaking. |
Before changing the toilet or kitchen position, the direction of the drainage pipe and the rules for the building should be confirmed. Bad drainage design is after the day.The tunnel's stuck.See you.Drain clearance guide The use of the Internet; We've got a leak.How leaking pipes are traced and repaired。
9 Waterproofness and construction order
Water and electricity work in the middle of repair.
- Clear.We're going to have to remove the old ones and show them the original lines and pipes, and we're going to make sure that the situation is real.
- Set a line to locate.The site is marked by a map of the location, switch, lamp level and water level, which is confirmed by the owner.
- Cut chases and install electrical conduit.Sets the pipework and wires, saves the bottom box.
- Install supply and drain pipes.After completion, try the pressure and water.
- Waterproofing works.Bathrooms, kitchens and terraces are painted with waterproof layers and water storage tests are conducted.
- Mud work.Blah, blah, blah.Bricking Project And the platform.
- The ceilings and the compartments.The plaster.In front of the roof seal, the circuits and pipes hidden in it were re-checked.
- Batch of grey paint.
- Install.Plug-in panels, lamps, detergents and electric appliances.
- This post is part of our special coverage Syria Protests 2011.
Waterproof bathrooms.
- Waterproofing should cover the entire platform and extend up the wall; The walls of the shower area should be higher.
- The position of the pipe through the floor and the wall, the corner of the wall and the doorbell are the most easily leaked places.
- A water storage test must be performed before bricks are laid to confirm that there is no leak in the downstairs residence.
- Do not cut or drill into the waterproofing layer after it has been installed.
Bathroom waterproofing For neighbour disputes and penalties arising from failure, see Who is responsible for water seepage?。
10 Records, receipts and documents
Take a picture of the wall.
Lines and pipes should be completed and the wall sealed, each wall and floor should be photographed and a map of their location should be kept. It is possible to avoid the drilling of wires and pipes when it is built, fitted or repaired after the day.
Completed acceptance items
- Test all the plugs, switches and lights one by one.
- Press the leaking circuit breaker test button to make sure the breaker jumps properly.
- Check if the partition signs for the distribution disk match the actual pattern.
- Power-to-power one by one, make sure there's no breaker jump.
- Open all water taps, check cold and hot water, pressure and position.
- All the drain levels continue to drain, and check the drainage speed and refilling.
- The toilet flushes and water tanks are normal.
- air conditioners runs and inspects drainage.
- Bathroom and kitchen water tests. No leaks from downstairs.
Documents to be obtained
| Documentation | Purpose |
|---|---|
| WR1 Completion certificate | Prove that the power device has been tested and is in accordance with the legal security requirements. |
| Water and electricity circuits and photos | The basis for the maintenance and modification of the day. |
| The price bill, the contract and the receipt. | Certificates for maintenance and handling of disputes |
| Maintenance documents for electrical appliances and cleaning equipment. | We'll fix it in a few days. |
| Approval documents for the administration or related departments (if applicable) | Proves that the project has been conducted according to rules. |
The complete check method before joining the group. See.Pre-occupancy plumbing and electrical checklist For points to check in quotations and charges, see Yuen Long repair prices for 2026 and Repair quotation pitfalls in Yuen Long。
List of water and electricity plans for each room.
| Location | Electricity | Water and drainage |
|---|---|---|
| Xuan. | Plugs, walkie-talkies, electric door locks, sensor lights. | — |
| Hotel. | Television walls, air conditioning, tablesides, adornment lighting, routers | Cold-air drainage. |
| Sleeping room | Bedside, desk, closet lighting, air conditioning. | Cold-air drainage. |
| Kitchen. | Snowboxes, stoves, boilers, gas-smoking machines, small floor electric units, water filters | Kitchen sink cold, hot water and drainage, dishwasher, washing machine |
| Bathroom. | Bathbaths or exhaling fans, waterheads, mirrors, smart toilet boards | Drain, toilet, shower or tub, floor drain |
| Terrace or workspace | Laundry, dryer, lighting | Water, drainage and surface drainage |
Attention to different types of housing
- Public housing Changes to fixed devices, such as power sets, wires, plugs and branches, must be requested in advance from the housing office and some of the devices cannot be altered. I see.How repairs differ in Tin Shui Wai and Yuen Long。
- Private residential complex The registration is conducted in accordance with the terms of the deed and the maintenance of the administration. See? YOHO Series、Park Signature and The Woodsville、Central Park Towers and Riva.guide.
- The old downtown building.: Old and old circuits and pipes, most of which need to be completely changed. I see.Repair guide for central Yuen Long。
- Village house: Take care of the charge, outdoor power devices and sewage. See?Guide for village-house owners in Yuen Long。
- The Yoga.: Pipelines cut through three floors, air conditioners and bathrooms in large numbers. I see.Palm Springs, Royal Palms and Fairview Park guide.
- New building.: Complete the collection before repositioning. See?Repairs in Hung Shui Kiu and Ha Tsuen。
- Rental and branch units See:Who pays for repairs in a rented home?and Repairs in subdivided flats in Yuen Long。
In addition, minor works involving the alteration of buildings structures, outer walls or drainage systems that may fall under the Building Regulations must be carried out by a registered contractor and should be checked with the contractor or the Housing Agency before starting work.
There's a lot of errors in the water distribution.
- Set up the plug without setting a table.: The interpolation is blocked and can only rely on power plugs.
- Use the old wire to increase the power.: The old line may not be carrying enough traffic, causing heat and breakers to jump.
- Power-sharing circuits.: Air, hot water and stoves will jump with a breaker at the same time.
- Change to a bigger breaker without evaluation.: Breakers must match the power of the power lines.
- Bathroom plugs are too close to shower position.: does not meet the distance requirement of the rule.
- Ignore drainage slopes: Slow drainage and refilling after the cleaning has been moved.
- No pressure or water storage tests.: Bricks were laid before leaks were discovered.
- No pre-screening.: The ceiling and the equipment inside the cupboard cannot be repaired after days.
- There's no photo before the wall.: Damage to electrical wires or pipes while drilling walls after the day.
- I didn't get a certificate of completion._Other Organiser
There's a lot of problems with the home-based plumbing.
At what stage should the water and electricity work take place during the renovation?
Water and electricity cover works should be carried out after they have been removed, before the mud and the barbers. In general, the order is to remove, open and install electrical pipes, place water pipes and drainage pipes and test them for pressure, waterproofing and water storage tests, mud-painted bricks, and install panels and electric appliances, with final inspection tests. The wall will be sealed before it is changed, and it will have to be reopened, and the cost and time will have to increase.
Do you have to change the power lines in the house?
Not necessarily, depending on the current state of the line and the demand for electricity after the day. The Department of Electrical and Electrical Engineering suggested that a certified electric contractor be arranged to carry out a feasibility assessment prior to the installation or replacement of the electrical device, taking into account the amount of electricity required after the day. It is generally recommended to replace the buildings, which are of a relatively old age and have no leaking circuit breakers or older units of circuits.
Can the power works be performed by a repair maintenance technician?
The power work involved in the repair works is no exception and must be performed by a certified electric contractor and by an appropriate certified electrician. It is illegal to employ a non-certified electric contractor for power work, with a maximum fine of HK$ 100,000 and imprisonment for six months. If the repair company is not itself a certified electric contractor, it should confirm that its assigned electrical work is the responsibility of the registered operator.
What kind of power file should we get when the work is done?
Once the electrical device has been installed, installed, modified or repaired, it must be inspected and tested by a certified electrician prior to transmission, and a certificate of completion (Form WR1) signed by a certified air contractor and an engineer. The user is not obliged to hand over the certificate to the Electric Engineering Agency, but should keep it properly.
Which power units need independent circuits?
The Department of Electrical and Electrical Engineering has pointed out that power should be supplied with stand-alone outlets using large power units. According to the Electricity (Line) Regulations, single-phase domestic appliances with power traffic exceeding 13 Amber's should be permanently connected to an independent radio-final circuit and controlled by a two-polar switch located near the power plant. The most common examples include air conditioners, electric heaters, electromagnetic furnaces and electric furnaces, which are indeed designed by licensed electricians according to electrical specifications.
Can you install a slot in the bathroom?
Yes, but limited. According to the Electricity (Line) Rules, bathroom plugs must be installed at a distance of 0.6 metres from the tub or tub and be protected by the remaining power-driven currents of 30 mA or by standard insulation transformers.
How many should be installed?
There is no number drawn. The Department of Electrical and Electric Engineering has indicated that there should be a sufficient number of purpose plugins in the room, each of which should be plugged into only one Manpower Suu or one power plug. The plans should be listed by room plasters and electrical placements, with the addition of electrical units after a set date to avoid long-term reliance on power plugs.
Do you need to apply for additional power during the renovation?
It depends on the results. If new air conditioners, electric heaters, electric magnetizers, etc. are used to overload the total electricity demand, it is necessary to apply to the power company for a change in the power load and to work with a certified gas contractor and submit a certificate of completion.
What's it gonna take to change the pipes?
According to the Regulations on Water Facilities, prior written permission for the construction, installation, modification or dismantling of an internal water supply system must be obtained from the Water Supervisor, usually by a licensed plumber, and the work must be carried out by a designated person such as a licensed plumber.
What's the impact of new electrical circuit compliance on repairing?
A new version of the Electricity (Line) Rules and Regulations was published on December 31, 2025 with a one-year extension. Devices that meet the 2020 rules must be supplied with electrical power by 31 December 2026 or so, in order to qualify as such. The work that was subsequently completed should be designed in accordance with the new code of conduct and could be consulted, if any, by a certified air contractor.
Sze Kit Electrical and Plumbing Water and Power Engineering Services
Sze Kit Electrical and Plumbing House Maintenance Company holds certified electric power engineering contractors and small-scale engineering business qualifications for the homes and businesses of Yuen Long, Tin Shui Wai and Tuen Mun:
- Yuen Long Hydroelectric Engineering: Full house wiring, distribution and upgrades, plugin installation, lighting installation, completion of signature certificate
- Pipework: full-house change of pipes, cleanliness installation, handbasket change, kitchen sink installation, hot water stove installation
- Air conditioning: Fragmentation installation, window air-conditioning installation and independent power circuits
- Waterproofing works and mud engineering Waterproof baths, brick-painting, ash paint
For details, visit Our services and Past projects, or by Contact us to enquire and request a quotation.
Further reading: electrical and plumbing repairs in Yuen Long
- Pre-occupancy plumbing and electrical checklist
- Breaker trips and WR2 testing
- Who is responsible for water seepage?
- How leaking pipes are traced and repaired
- Choosing a repair technician in Yuen Long
- Home maintenance in humid weather
- Pre-typhoon electrical and plumbing checklist
- Overnight emergency repairs in Yuen Long
- 24-hour emergency repairs in the northwestern New Territories
- Hong Lok Yuen maintenance guide
- So Kwun Wat, Gold Coast Water and Air Services
- Locksmith and lock replacement guide
References
- Electric and Mechanical Services Department: new rules for electrical (wire) work
- Electric and Mechanical Services Department: Home-based Electricity Safety Handbook
- Electric and Mechanical Services Department: new installation, addition or adaptation
- Water Department: licensed plumbers
- The House Department: Small Engineering Supervision System
The content of this paper is for general reference and does not replace professional design. The actual design of the power plant must be carried out by a certified electrician in accordance with the existing Electricity (Line) Regulations and the conditions on the ground.