Hung Shui Kiu and Ha Tsuen: new-home inspections and relocating plumbing and electrical fittings
Key points
- The first residents of the new development zone were joined in 2024, and the second was set up in 2030.
- For defects in a first-hand residential property, buyers can Six months after the date of sale.Inform the seller in writing and be compensated by the seller at its own expense.
- When closing the building, you should test electrical power, pipes, drainage and air conditioning on a case-by-case basis and submit a list of leaks in writing.
- First, it's a catch and a leak, then it changes. It is not within the seller’s responsibility to provide relief for the inconvenience caused by the buyer’s actions.
- Adding a socket、Moving a socket When the power works, it's necessary.registered electrical contractor The project is being conducted and a certificate of completion has been signed.
The Hung Shui Kiu/Ha Tsuen New Development Area lies between Tin Shui Wai, Yuen Long and Tuen Mun. It is a major Northern Metropolis development. As public and private homes are completed, residents need to know what to inspect at handover, whom to contact about defects and which rules apply when adding or moving fittings. Nearby village houses have different maintenance needs.
Written by Sze Kit Electrical and Plumbing Services. We are a registered electrical contractor and registered minor works contractor serving Hung Shui Kiu and Ha Tsuen. This guide covers handover inspections, reporting defects, moving fittings and the needs of different local homes.
Hung Shui Kiu / Ha Tsuen
| Item | Data |
|---|---|
| Location | southwest of Yuen Long District, around Hung Shui Kiu, Ha Tsuen and the bridge |
| Total development area | About 441 millimeters |
| Full-scale housing supply | About 66,700 new housing units, with an additional 183,900 people. |
| _Other Organiser | Three parts: first, second and the rest |
| Development of the first phase | Work started in July 2020; The first residents joined in 2024. |
| Phase II development | Start of work in 2024; It has provided about 36,400 units, and about seven have become public houses. The target is for residents to join since 2030. |
| Railway | The Dunma Hung Shui Kiu station was launched in conjunction with the second phase of development. |
The above data are from Civil Engineering Outreach and Legislative Council documents, with time schedules based on the latest government publication.
Area housing type and maintenance arrangements
| Residential type | The Path to Water and Power Problems |
|---|---|
| Private residences, first hand. | The seller is informed, in writing, of any shortcomings during the maintenance period. After the expiry of the deadline and the self-changed part, the owner hires a maintenance technician. |
| Rental units for public rental housing and for the exclusive use of housing estates | The owner ' s stationary equipment was damaged by normal wear and tear, and it was reported to the housing office; Self-contained power units are handled by the residents themselves. |
| Financial sales unit | The business owners are responsible for the interior; Dealing with problems at the time of delivery as arranged by the Documents and Management Service. |
| The old private housing complex and the single building. | The owner hires a maintenance technician himself. Public Sector Contact Management Service |
| Village house | The owner is in charge of the whole building, including the roof, the outer wall, the outdoors and sewage. |
Distinction between the responsibility for maintenance of public and private buildings. See How repairs differ in Tin Shui Wai and Yuen Long The use of the Internet; See you in the taxi unit.Who pays for repairs in a rented home?。
Six months of maintenance and default.
According to the First-hand Sale of Residential Property Ordinance (Cap. 621), the following arrangements must be made for the purchase and sale of goods:
- Where there is an inappropriate property or the purchase or sale of equipment, fixtures and equipment listed in a contract which is not caused by the buyer's actions or negligence, the buyer may Six months after the date of sale.Send written notice to the seller.
- The seller, after receiving notice, must make the best of it to the extent reasonably practicable and at its own expense.
- The sales house has been set up to provide information on the equipment, materials and facilities that can be used by the owner to check whether the units are consistent with the description.
Method of making a request for omissions
- Check it out when you close the building.This post is part of our special coverage Global Voices 2011.
- Submitted in book form.Fill out the form or list yourself provided by the seller, and keep a copy and hand over the certificate.
- Keep a record of follow-up action.In a post entitled "The Question of Peace and Security" (A/CONF.191/CRP.1, p. 2), we have written about the requests and responses received from both sides.
- Override.The seller completed its work and made a case-by-case review, and the unprocessed resubmission was filed in writing.
- Pay attention to the deadline.The problem that was discovered later must be notified in writing within six months of the date of the deal.
The Superintendence of First-hand Home Property Marketing has taken the example of a seller who, after several calls from its owner, requested follow-up and failed to properly process it, made a paper submission on the leak list before the seller arranged for the completion of the repairs. If the buyer believes that the seller has failed to comply with the terms of the contract, it may consider filing a civil suit and requesting professional and legal advice, as well as consulting the Consumer Board.
Keep an eye out.
The period of six months, which starts with the date of the "business transaction" and does not necessarily equal the date of the key acquisition, should be based on a contract of sale. The request of the seller to return the warrant in a shorter period of time at the time of the transfer is a practice that facilitates a uniform arrangement; The seller is still responsible for following up on the issue, as long as it has been notified in writing within the statutory deadline.
The new building's water and air-conditioning test list.
Electricity
- Disk distribution: Whether the partition signs are clear; Press the leaking circuit breaker test button to confirm the breaker jump and reset.
- Plugin: Test by electric or tester on a case-by-case basis to see if the panel is loose, tilted or fractured
- Switches and lights: one by one, check the control light.
- Doorbells, walkie-talkies, and air fans.
- TV, telephone and Internet outlets
- The number and location of the plugs and switches are consistent with the saloon instructions.
Water pipes and drainage
- Open all water taps and check if the cold, hot, pressured and outing are clear.
- Are there any leaks of horns, soft pipes and rebuttals in the sink, by the toilet and under the kitchen?
- Is it normal to flush the toilet and the tank, or is there water on the bottom?
- Batteries, kitchen tanks, tubs and floor drains, checking drainage speed and refilling.
- Sewage slopes on the bathroom and terrace floor, if any.
- Close all taps and watch the watch. Make sure it doesn't turn.
Air, water heater and other devices
- air conditioners's running, checking cold, wind, drainage, noise and remote control.
- Water heat run and check water temperature
- Cookers, oil smokers and other attached electric appliances
- Checks whether the brand and model of the equipment match the building's instructions and requests maintenance documents.
Leak
- Is there any water or stains on the roof, corner of the wall, by the window and on the window table?
- Whether the window frame seal is complete
- The bathroom and kitchen.
A more complete line-by-line check, see Pre-occupancy plumbing and electrical checklist The use of the Internet; Check the leak with a watch. See.How leaking pipes are traced and repaired。
The water and air-conditioning defects that are common in the new building.
The following table shows the situation in which new homes are usually found, not the quality of the Hung Shui Kiu / Ha Tsuen subdivisions.
| Category | It's common. |
|---|---|
| Electricity | A separate plug-in is free, panel is loose or tilted, switch and light position mismatches, split sign error |
| Pipes. | Angular brakes or debarmentation, water taps loose, water pressure low, cold and hot. |
| Drain. | Slow drainage, low surface drainage slopes leading to water accumulation and construction of complexes on the convection of air |
| Cleaning. | The toilet flushed poorly, the water tank parts were unadjusted and the seals were incomplete. |
| Temperature | Inadequate drainage slopes cause dripping, incomplete temperature protection and remote control failure |
| Leak | The windows are closed, the bathroom's not properly waterproof. |
If not caused by the buyer, and within a period of time notified in writing, these items fall within the scope of the seller’s remedy.
Collection, leakage and repositioning order
Many of the owners were in a hurry to repair after closing down. However, the disadvantage is caused by the buyer ' s behaviour and does not fall within the seller ' s remedy; Once the change has been made, it is easy to argue when the relevant parts are submitted later. A more stable order is as follows:
- The building and the collection.: Complete the check without any changes.
- Take a picture of the original.: Pre-existing status of power distribution, circuits, pipes, detergents and air conditioning.
- Submit a list of omissions in book form。
- Vendor repair and review。
- Plan change.: Plugs, lights and water levels by gills and power positions.
- Check in with the administration to do the maintenance and repair。
- Construction, testing and obtaining certificates of completion。
It is also useful to know the maintenance of the equipment itself before changing the equipment attached to the building.
Water and power repositioning before entry into the group
| Item | Common causes | What to notice. |
|---|---|---|
| Add plugins, plug moves. | The number and location of the original plugs do not match the tablets. | It's a low-cost design of the division. Avoid installation near taps, gas switches and furnaces. |
| Placing and placing lights. | Adding spotlights, light strips and pendant lights | It's done by a certified electrician on a fixed line. |
| Independent circuits for large power generators. | Add electric magnetizers, steam furnaces, or hot water heater, dryer | Evaluate the allowable load of units first |
| Bathroom valet installed. | Improvement of bathroom ventilation and heating | Retention of stand-alone power supply and ventilation. |
| Laundry, dishwasher position | Change water and drainage levels. | Sewage slope and position of rebuttal |
| I'm making electricity from the turbo. | Lighting in the cabinet, electrical devices. | Save plugins or connect points and maintain them after convenient days |
The plan and the list of rooms. See you.Planning plumbing and wiring for a renovation The use of the Internet; I'll see you in the bathroom.Repairing or replacing bathroom heaters and extractor fans。
Legal requirements for repositioning water and electricity
Electrical work
- The Department of Electrical and Electrical Engineering stated that the owner of the electrical device was required to arrange for any power work by a certified electric contractor, as well as the power work involved in the repair works.
- Prior to loading or refitting, a certified power contractor should be arranged to conduct a feasibility assessment and take into account the amount of electricity required after the day.
- Upon completion, the certified electrician must inspect and test and issue a certificate of completion (form WR1); The user has no need to hand over the EMP, but it should be kept properly.
- It is illegal to employ a non-certified electric contractor for power work, with a maximum fine of HK$ 100,000 and imprisonment for six months.
- A new version of the Rules for Electricity (Line Lines) has been published on December 31, 2025. The 2020 version of a device must be supplied with electrical power by 31 December 2026 or so, in order for it to meet the rule.
Pipework
- The construction, installation, modification or dismantling of the internal water supply system requires prior written permission from the Water Supervisory Authority and is carried out by designated persons such as licensed plumbers.
- Gas installations must be handled by the registered gas equipment mechanics of the registered gas projectors.
Check the way in which the business is performed. See Choosing a repair technician in Yuen Long and Choosing a registered electrical contractor。
Attention to the public housing unit.
The percentage of public housing in the new development areas is very high, and the first group to be joined was for the purpose of housing.
- Rental units: The owner of the fixed device. In the case of public rental housing, for example, power distributions, wires, plugs and branchings, etc., must be requested in advance from the housing office; Part of the device cannot be changed.
- Financial sales unit The employer has to perform the decorative and certiorial duties of the public register, in accordance with the regulations of the public deed and administration.
- Installing Air Centers In the case of public rental housing, the dwelling must first apply to the housing office and be installed at a designated location.
- The housing stock is operated by different agencies and should be organized in accordance with the guidelines of their respective premises.
You should consult the housing office or management office before starting work, so that you do not have to be asked to return after a few days.
There's a lot of trouble in the early days of entry.
| Fault | The reason why the new building is more common. | Recommended action |
|---|---|---|
| Breaker jumps. | Separate power, multiple power, time-line damage or inappropriate denial at the same split | The power is removed from the source, each case; If you can't find it, then arrange for a check. |
| Slow or pour the drain. | The sand, glue and groceries of the season. | Arrange for drainage pipes; It's time to seal the drain. |
| Water leaking from an air conditioner | Inadequate slope of the drainage pipes or clogged by a patched dust. | Inspection of drainage pipes; Clean up the air conditioners after refitting |
| Poor cooling | Fixing dust clogged air filters and evaporation, installation problems. | Cleaning; The original equipment for the period of maintenance is notified to the seller. |
| We're going to have to take the water out. | Angular brakes, soft pipes failure. | Turn off the angles and arrange for a change or re-interception. |
| Water by the window. | The silence is incomplete. | Inform the seller in writing during maintenance. |
There was a lot of dust during the fit-out period, and it would be appropriate to clean up the air conditioning once it had been completed. Related articles:It's the reason why the breaker jumps.、Drain clearance guide、Ten reasons an air conditioner may not cool properly、How often should an air conditioner be cleaned?、Water heater fail signal For seepage between upstairs and downstairs flats, see Who is responsible for water seepage?。
Late at night, a breaker jumps or a hose burst. See.Guide to emergency repairs overnight in Yuen Long and 24-hour emergency repairs in the northwestern New Territories。
Water and electricity problems in the Hung Shui Kiu, Ha Tsuen country homes
There are still a lot of old villages in and around the new development areas.Village-house electrical and plumbing repairs The focus is completely different from the new building:
- Power supply.: Three-storey air conditioners and electrical heat equipment are available, and additional power is required in case of insufficient single supply or Three-phase powered.。
- It's getting old.: It's better to check the power lines and distribution plates in higher-age rural homes, considering Whole-home rewiring。
- Outdoor power.This is the case with garden lights, gates and pumps that are protected from water and protected by residuual current device.
- Water on top floor.: Aging of the roof and congestion of the drains.
- Sewage.In rural areas where public sewers have not been denied, the Environmental Protection Agency has recommended a minimum of six monthly inspections.
- Plus and Change: The height or cover limit of the house beyond the New Territories exemption would invalidate the exemption.
See Guide for village-house owners in Yuen Long and Sai Pin Wai and Nam Pin Wai village-house repairs For electrical supply arrangements at local shops and restaurants, see Electrical and plumbing work for shops and restaurants The use of the Internet; I'll see you in the booth.Repairs in subdivided flats in Yuen Long。
Construction arrangements for new residential units
At the beginning of the new housing complex, a large number of units are being repaired at the same time and the administration generally has more stringent arrangements in place. Before construction, the management should be asked:
- Decoration of the register and whether or not to pay the fee
- Time and days of construction
- Worker registration and elevator utilization arrangements
- The disposal of building waste.
- Rules for the appearance of air conditioners, outer walls and windows
- Water, power, notification arrangements.
Data available to the maintenance technicians
- Home name, number of seats, floors and units
- The flat map and the tablet setup of units
- The power of the planned power.
- Missing progress
- Estimated date of entry
Take care of the fees and fees.Yuen Long repair prices for 2026 and Repair quotation pitfalls in Yuen Long For seasonal maintenance, see Home maintenance in humid weather and Pre-typhoon electrical and plumbing checklist。
Hung Shui Kiu / Ha Tsuen Pipeline and Electrical Repairs
Hung Shu Kiu / Ha Tsuen, when did the new development area start to have residents?
The new development area is being developed in three phases. The first development project started in July 2020 and the first residents joined in 2024. The second development project started in 2024, with the goal of getting people into employment since 2030. After all, the new development area will provide about 66,700 new housing units.
When the new building closes down, there's a problem with the water and electricity. Can we ask the developers to fix it?
Yes. According to the first-hand residential property sales ordinance, a contract of sale must state that, where there is an inappropriateness in the equipment, furnishings and equipment listed in the home or contract, but not caused by the buyer’s actions or negligence, the buyer may issue a written notice to the seller within six months after the date on which the sale was concluded, and the seller must pay for it as soon as reasonably practicable.
How should a request for oversight be made?
It should be made available to the seller in writing and a copy retained. The Superintendence of First-hand Home Property Marketing notes that it is very important to make a paper-based request for leakage, and that the owners should also document requests and responses from both parties in writing so that they can follow up later.
What are the water and electricity items to be checked when the new building closes down?
Power should check the distribution and leak circuit breakers, all plugs, switches and lights; Water pipes should check the cold, hot water and water pressure of the taps, debarment, toilet flushing and drainage levels. In addition, air-conditioning units, hot water stoves and pneumatic fans have been tried on a case-by-case basis, and the roof of the room, the corner of the wall and the window are checked for water.
Can we change the power for a while?
This is not the responsibility of the seller to provide relief, as it was caused by the buyer’s actions. After the owner has changed his/her own mind, he/she may dispute that he/she is in a position to file a claim on the part in question. It would be more stable to complete the receipt and submit a list of omissions, and to take photographs of them before making changes.
Do you need to find a certified electric contractor for the new building to install or reposition it?
Yes. The electrical work involved in the commissioning works had to be performed by a certified electrician contractor, after which the certified electrician tested and signed the certificate of completion. The power works are carried out by non-certified electric contractors, with a maximum fine of HK$ 100,000 and imprisonment for six months.
Why would the new building jump off a breaker?
Most of the breakers in the new building have nothing to do with the ageing of the circuits, often because other power failures, multiple large power units are being used at the same time as the same division, or the inter-wire circuit damage and failure during refitting is inappropriate. The power should be removed from the source, one by one, and the failure to do so should be tested by a certified electrician.
Can public housing units switch their own water and electricity?
It's a house type. The fixed devices for public rental housing are owned by the Housing Board and change to the usual requirement of applying in advance to the housing office; The business owners of the entities that finance the sale must comply with the rules of public deed and administration. You should ask the housing office or the management office before you start work.
What's the common problem with water and electricity in the villages of Hung Shu Kiu and Ha Tsuen?
Similar to other rural dwellings in Yuen Long, including the lack of power supply for breaker jumps, the ageing of electrical lines, out-of-house power failure, water on top, and the maintenance of scavenging ponds in rural homes that do not contest public sewers.
Hung Shui Kiu, do you have 24-hour plumbing and power maintenance?
Sze Kit Electrical and Plumbing House Maintenance provides 24-hour plumbing and gas maintenance, including Hung Shui Kiu and Ha Tsuen, to call or whatsApp 9231 6650 Arrival time depends on the technician’s location and traffic.
Hung Shui Kiu, Ha Tsuen Hydroelectric Services of Sze Kit Electrical and Plumbing
Sze Kit Electrical and Plumbing House Maintenance holds certified electric power engineering contractors and small-scale engineering business qualifications for the districts of Hung Shui Kiu, Ha Tsuen and Yuen Long:
- Water and power repositioning in the new building.: Installation of plugs, transfer of slots, installation of light decorations, stand-alone circuits, completion of signature of certificate
- Yuen Long Pipes and Gas Maintenance Breakers jump-up maintenance, leaking power maintenance, rural residential power works
- Air conditioning Air-conditioning installation, cleaning of air-conditioning after installation, air-conditioning maintenance
- Pipes and canals.Plumb maintenance, detergent installation, Yuen Long Drain removal, Yuen Long leak maintenance
- 24-hour electrical and plumbing repairs
For details, visit Our services and Past projects, or by Contact us to enquire and request a quotation.
Further reading: electrical and plumbing repairs in Yuen Long
- Pre-occupancy plumbing and electrical checklist
- Planning plumbing and wiring for a renovation
- Electrical, plumbing and air conditioning maintenance at YOHO
- Maintenance at Park Signature and The Woodsville
- Home maintenance at Riva
- Maintenance at Central Park Towers
- Repair guide for central Yuen Long
- So Kwun Wat maintenance guide
- Palm Springs, Royal Palms Home Maintenance
- Fairview Park maintenance guide
- Hong Lok Yuen maintenance guide
- Locksmith and lock replacement guide
References
- First-hand residential property sales regulatory agency: After taking over the building, we found out there was something wrong. What should we do?
- Hong Kong, one stop for the government: buying a home and property business.
- Hung Shui Kiu / Ha Tsuen New Area: Development mileage
- Civil Engineering Outreach Agency: Hung Shui Kiu / Ha Tsuen New Zone Development Phase 2
- Electric and Mechanical Services Department: new installation, addition or adaptation
This is a general reference and does not constitute a legal opinion. The duration of the maintenance liability and the responsibility of both buyers and sellers are based on the contract of sale. The schedule for the new development area and the arrangements for the ministries may be updated, subject to an update.